Home > Linear Motion Bearings > Ballscrews >

400MM long lead screw and a nut
400MM long lead screw and a nut


 
Alternative Views:


Our Price: $19.95

Product Code: 400MM-LONG-LEAD-SCREW-NUT
Qty:

Description
 
400MM long lead screw and a nut

End
End

400MM long lead screw and a nut

  • Item: Leadscrew
  • Type: Lead screw + a NUT
  • Length: 400mm
  • Material: 304 Stainless Steel
  • Screw Pitch (lead): 2mm
  • Diameter: 8mm
  • Quality:High speed operation and durability
  • Quantity: One leadscrew+One Nut

400MM long lead screw and a nut


400MM-LONG-LEAD-SCREW-NUT


Share your knowledge of this product. Be the first to write a review »